generar-backlog
Installation
SKILL.md
PRD + Tech Design → Backlog Decomposer
Goal
Turn an approved PRD.md and TECH-DESIGN.md (with its ADRs) into an ordered backlog of
implementable specs — the missing bridge between "I have a product and an architecture" and
"I know what to build first." Each backlog item should be scoped so it can become a single SDD
change (one sdd-new/spec-driven cycle), not a whole feature area and not a single button.
This skill does not run SDD itself and does not write code — it produces the map that the SDD cycle will consume one item at a time.
Required Input
PRD.md— required.TECH-DESIGN.mdand itsadrs/*.md— required. Decomposition without the architecture produces backlog items that don't respect component boundaries.
If either is missing, stop and ask for it.