SDLC Checkpoint Skill
Goal
Create durable snapshots at each SDLC gate so the project can be resumed, audited, or rolled back to any milestone. Verify all gate criteria before advancing to the next phase.
SDLC Phases
This table details the gate criteria for the 10-phase core build loop (S01–S10). The full lifecycle is 14 phases: Day-0 strategy S00 (GO/NO-GO gate) runs before S01, and Day-2 S11–S13 (operate / evolve / sunset) run after S10. Checkpoint those phases too — see
brain/loki-mode.skillfor the complete S00–S13 phase table and gates.