done-blocked
DONE / BLOCKED Reporting Contract
Terminal status is exactly two states, and BLOCKED requires specific evidence — not vague obstruction reports.
The contract
Every agent's final handoff line is one of:
DONE: <one-sentence summary of what shipped>
artifact: <path to report/PR/commit>
next: <who picks this up — pipeline stage, gate, or "pipeline continues">
More from avelikiy/great_cto
great_cto
Use when the CTO describes a feature, task, or project goal. Orchestrates the full SDLC pipeline automatically based on project type.
14skeptical-triage
Reusable 3-round self-challenge + arbiter pattern for filtering false positives from findings/verdicts. Use when the cost of a false-positive gate block exceeds the cost of ~4 extra LLM turns.
13well-architected
6-pillar architecture review framework. Adapted from AWS Well-Architected for use by great_cto's architect agent on every non-nano ARCH document. Forces explicit answers across operational excellence, security, reliability, performance, cost, and sustainability — not just feature design.
1prose-style
Reusable writing-style contract for agent outputs (reports, ARCH docs, verdicts, threat models). Forces direct prose with concrete evidence, no marketing voice, no hedge words. The single most-referenced skill across the pipeline — used by 28 agents.
1discovery
Structured pre-design questioning to surface hidden constraints before any architecture decision is locked in. Forces the architect/auditor/reviewer to enumerate what they DON'T know before proposing.
1cost-model
Standardized cost-estimation framework for great_cto plans. Forces explicit LLM cost, infra cost, human-supervision time, and the (defensible) human-equivalent comparison. Output format is parsable by the board's /api/cost path — must follow exactly.
1