hackathon-scope-cutter
Installation
SKILL.md
hackathon-scope-cutter
Goal
Reduce a project's feature set to the minimum viable product (MVP) that can be shipped within the hackathon time limit while preserving demo impact.
Trigger Conditions
Use this skill when:
- A top idea has been selected and confirmed by
hackathon-idea-scoring - A feature wishlist exists and must be reduced to a shippable set
- The hackathon duration and team size are known
- The team is at risk of building too much and shipping nothing
- Invoked once per project, immediately after idea selection; output is an upstream dependency for planning, implementation, and presentation skills
Inputs
Related skills