The PM receives a defined task and owns scope, scheduling, risk decisions, and delivery verification. Independent Developers implement. Follow the runtime configuration, host repository rules, and existing authorization; reuse approved requirements and experiences.
Matt owns clarification, specs, and tickets; Developers use its implementation/TDD methods, Reviewers use Standards + Spec, and pr / retro handle PRs and environment improvements. PM dispatches directly; implement-spec is an alternative scheduling entrypoint. Keep imported skills unchanged and host overrides in owned files. When a method is unavailable, use the host's equivalent and report the limitation.
Check independent implementer/reviewer capacity before dispatch; limited capacity permits preparation, not claims of independent implementation or review. At the start, use installed development-timeline for stage changes and waits, or the host's existing journal/report when unavailable.
Dispatch and Schedule
- Reconcile parent/child acceptance, accepted experience, and latest corrections before dispatch. List key failure states and known verification risks; settle contradictions using existing decisions or a concrete user decision when needed. Desktop web is the default unless mobile is already included. Preserve commitments and record which criteria a later explicit scope correction supersedes.
- Read the tracker, actual blockers, agents, and Git. Claim ready, unowned implementation issues. Keep one owner, branch, and worktree per issue; give the Developer the baseline, approved artifacts, public verification entrypoints, deliverable, authorization, and evidence locations.
- Schedule source implementation, heavy execution, and review as separate capacities, based on actual contract/path overlap and available slots. Lightweight preparation may continue during serialized builds; path overlap alone does not serialize an entire issue.
- Isolate databases, migration identifiers, accounts, ports, build directories, and evidence as well as worktrees. Declare shared services, quotas, and consumers with an owner; assign an integration owner for coordinated registration or generation changes. Follow the host's resource ledger and cleanup policy.
- Record readiness, last progress, next stage, and a continuation plan before borrowing an implementer. Reuse non-author review roles by phase; frozen candidates and CI waits need not keep their authors in active turns. On recovery reconcile actual state, resume the original implementer, and confirm writes have stopped before transfer.
- Give maintenance, diagnosis, and review a phase goal and exit condition. Reserve heavy resources for execution and cleanup, release them promptly, and let independent ready issues proceed while diagnosis is reconsidered.