Report Verification — Reverse Engineering Phase 4 Critic
Verify the consolidated As-Is specification produced by re-generate-report against the Phase 1-3 source artifacts. Runs as an independent Critic in a separate agent context.
Three Principles (Critic Perspective)
1. Code is Truth
- Phase 1-3 artifacts are the sole authority. If the report states something not present in the artifacts, the report is wrong.
2. Traceability to Line
- Every requirement in the traceability matrix must trace back to a Phase 3 document and ultimately to source code. Broken chains are failures.
3. Behavior over Intent
- Verify what the report claims against what the artifacts show. Do not interpret or justify discrepancies.