atlas
An initiative has arrived that is too big for one plan. One plan for all of it starts late, ends late, and learns from no build until the end. The atlas shortens that feedback loop. It charts the initiative as a graph of nodes. Each node gets its own plan and its own build, and each build sharpens the view of the nodes after it.
The atlas sits one level above /wayfinder. Wayfinder finds the way through one node. The atlas says which nodes exist, what each one gives to the others, and which ones can start now.
Chart high, decide late
The atlas holds only what two or more nodes share. All other design waits for the session that plans the node, because that session knows more: the builds before it are complete. The pull to design a node is the signal that the chart is complete and that it is time to print the briefs.
Node
A node is a vertical part of the initiative: when it is built, something new works from end to end, and a done signal proves it (a demo, a command, a metric). The first node is the thinnest one that works from end to end. A node that only prepares the ground (a migration, infrastructure) earns its place when a vertical node needs it.
Split a node only when each part has its own done signal and can be built and verified alone. Parts that must be designed together stay one node, at any size.
An edge from A to B means that B needs behaviour that A gives. The frontier is each todo node whose blockers are all done. Calculate it from the graph each time. Frontier nodes with no edge between them can run in parallel.
Each node has a route: the skill that plans it. Use wayfinder when the node has fog of its own, and grill-with-docs when its way is clear. Set the route for frontier nodes only.