cwicr-work-breakdown
CWICR Work Breakdown
Business Case
Problem Statement
Work items in CWICR contain aggregated resources:
- What materials make up a concrete work item?
- What labor categories are needed?
- What equipment is involved?
- How to generate detailed resource bills?
Solution
Decompose CWICR work items into their constituent resources (labor, materials, equipment) with quantities and costs.
Business Value
- Transparency - See inside aggregated items
- Procurement - Generate material lists
- Scheduling - Identify resource needs
- Cost control - Track resource consumption
More from datadrivenconstruction/ddc_skills_for_ai_agents_in_construction
cad-to-data
Convert CAD/BIM files to structured data. Extract element data from Revit, IFC, DWG, DGN files.
154dwg-to-excel
Convert AutoCAD DWG files (1983-2026) to Excel databases using DwgExporter CLI. Extract layers, blocks, attributes, and geometry data without Autodesk licenses.
125drawing-analyzer
Analyze construction drawings to extract dimensions, annotations, symbols, and metadata. Support quantity takeoff and design review automation.
85cost-estimation-resource
Calculate construction costs using resource-based method. Estimate project costs from work items, physical resource norms, and current prices.
63pandas-construction-analysis
Comprehensive Pandas toolkit for construction data analysis. Filter, group, aggregate BIM elements, calculate quantities, merge datasets, and generate reports from structured construction data.
45ifc-data-extraction
Extract structured data from IFC (Industry Foundation Classes) files using IfcOpenShell. Parse BIM models, extract quantities, properties, spatial relationships, and export to various formats.
42