mortgage-trid-timeline-checklist
Installation
SKILL.md
Mortgage — TRID Timeline Compliance Checklist
Industry front door for checklist. Adds domain triggers, example, packs only. Parent Process unchanged. Not legal advice. Verify against current TILA-RESPA (Reg Z/X) and CFPB guidance; business-day rules have nuances.
Activate when: an application hits the 6-item threshold (LE clock starts); approaching closing (CD clock); any change-of-circumstance / re-disclosure; "did we send the LE in time?", "does this trigger a new 3-day wait?" Do NOT activate when: pre-application shopping with no six items collected.
Why this variant
The parent checklist is a verifiable gate. TRID is a hard-clock gate whose misses cause cure liability and closing delays. This maps the disclosure clocks onto the parent's gate discipline.
Domain inputs → parent's gate
- LE: provide within 3 business days of a complete application (the 6 items) and ≥7 business days before consummation.
- CD: received by borrower ≥ 3 business days before consummation.
- Re-disclosure triggers: APR beyond tolerance, loan-product change, prepayment penalty added → new 3-day CD wait.
- Tolerances: zero / 10% / unlimited buckets; changed-circumstance documentation to reset.
- Records: retain LE/CD and evidence of timing.