neqsim-reservoir-material-balance

Installation
SKILL.md

Reservoir Material-Balance Analysis

Use pressure and cumulative production to test an in-place-volume hypothesis. This is a tank-level screening method, not a spatial reservoir simulator or a reserves classification.

When to Use

  • Estimate or reconcile gas initially in place (GIIP), original oil in place (OOIP), or total surface-component inventories from pressure and production history.
  • Compare a prior volumetric estimate with a pressure-production material balance.
  • Test depletion-drive, gas-cap, known-water-influx, or known-compressibility cases.
  • Separate formations or pressure compartments before matching a field total.

For compositional gas-condensate depletion, produced composition, or wellstream forecasts, use neqsim-reservoir-history-match-forecast. Use both workflows only when their fluid and volume bases are explicitly reconciled.

Inputs

Installs
1
GitHub Stars
5
First Seen
4 days ago