grill-me
Installation
SKILL.md
Grill Me
Stress-test one proposal until its important decisions, assumptions, dependencies, failure modes, and verification are explicit.
Start from evidence
Read the supplied proposal and its declared sources. Inspect code, tests, schemas, configuration, and documentation before asking for facts the repository can answer.
Build a small decision tree around the goal, users, constraints, ownership, boundaries, data flow, failure behavior, compatibility, rollout, reversibility, and proof. Follow only branches that can change the proposal.
Interview loop
- Ask exactly one consequential question.
- Include the answer you recommend from current evidence. Word the question so "yes" accepts that answer.
- Label an answer as an assumption when evidence is missing.
- State why the decision matters.
- Challenge vague scope, hidden assumptions, premature abstractions, and weak verification.
- Resolve the current decision before moving to a dependent one.
- Stop when the proposal is coherent, a required fact is unavailable, or the user asks to stop.