hrt-change-size-gate
Pass
Audited by Gen Agent Trust Hub on Aug 30, 2026
Risk Level: SAFE
Full Analysis
- [SAFE]: The skill operates as a procedural gate for managing project scope. It analyzes local documentation content ("What Changes" and "Capabilities" sections) to determine if a proposal should be split into smaller units.
- [SAFE]: File system activity is restricted to reading and writing project-specific documentation files (
proposal.md,discovery.md,openspec/BACKLOG.md). No sensitive system files or credentials are accessed. - [SAFE]: The skill contains no network operations, external downloads, or command execution logic. All decision-making regarding scope splitting requires explicit user confirmation, ensuring a human-in-the-loop safety model.
Audit Metadata