gao-cost
GAO Cost Estimating and Assessment Guide (GAO-20-195G)
Source: GAO (US Government work, public domain) | Chapters: 8
When to use
Use this skill to develop, manage, or evaluate a program cost estimate: framing the estimate's purpose and scope, structuring it with a WBS, choosing estimating methods, turning a point estimate into a risk-adjusted budget, documenting and updating it, auditing it against GAO's reliability criteria, and connecting it to earned value management for execution. This is the cost-estimating companion to the GAO gao-schedule and gao-tra guides and the management-side counterpart to a program's life cycle cost estimate.
Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.
How to Use This Skill
- Without arguments — load the core frameworks below: the four characteristics + 18 best practices, the 12-step process, the estimating methods, risk/uncertainty, EVM, and the specialized techniques.
- With a topic — ask about a characteristic ("credible"), a step ("ground rules and assumptions", "point estimate"), a method ("parametric", "learning curve"), a risk concept ("Monte Carlo", "confidence level", "contingency"), or an EVM term ("CPI", "EAC", "performance measurement baseline").
- With a chapter —
ch02/ch03/ch05(the 12 steps),ch04(risk/uncertainty),ch06(auditing),ch07(EVM),ch08(specialized techniques).
Supporting files: glossary.md, patterns.md, cheatsheet.md.
One discipline, two uses. The Guide is both an authoring standard (how to build a reliable estimate) and an audit standard (how to grade one). The same four characteristics and 18 best practices serve both. EVM (ch07) is the execution-side bridge: the estimate says what a program could cost; EVM measures whether it is delivering against a baseline built from that estimate.