Run a project the way a working tech lead and founder does: a single project record carries goal, scope, milestones, status, owner, risks, decisions, and next actions, and the record lives in the Obsidian second brain so the project correlates with the people, companies, and commitments around it. The system serves the work, so the lightest record that keeps the project honest wins.

Note CRUD stays outside this skill. Reads, writes, links, and frontmatter go through second-brain. This skill decides what the project record must contain and when the state changes.

The depth bar and the failure modes live in references/pm-system.md, next to a worked example. Read that reference before running a project for the first time.

Steps

  1. Define the project record. Create one project note holding goal (the outcome in one sentence), scope (in and out), the owner, and the current status. The command vault.sh capture project "<name>" owner=<owner> company=<company> cadence=weekly sets those fields at capture through second-brain. The goal names a result a reader can test, and a goal phrased as an activity fails that bar. The step is done when the project note states a testable goal plus an explicit out-of-scope line.

  2. Break the goal into milestones and tasks. Split the goal into 3–7 milestones, each with a date and a done-condition, then split the nearest milestone into tasks that each carry one acceptance criterion. Estimate against past actuals, and mark every dependency and the longest dependent chain (the critical path). The step is done when each near-term task has an acceptance criterion and the critical path is named in the note.

  3. Track work on a cadence. Hold work-in-progress under the stated WIP limit, and move a task forward only when its acceptance criterion is met. Record the state on a fixed cadence (weekly is the default). The step is done when open tasks sit at or below the WIP limit and the last cadence entry carries the current date.

  4. Log risks and decisions as they surface. Record each material risk with a likelihood, an impact, and an owner. Each material decision goes into a decision note linked from the project via second-brain. A risk without an owner does not count as logged. The step is done when every open risk has an owner and every decision since the last review is linked.

  5. Report status as changed / next / blocked. Write the status update in three parts (what changed since last report, what is next, what is blocked) and tie each blocker to the risk or decision it traces to, since an update that omits blockers is status theater. The step is done when the update names what changed, what is next, and the blockers (or states "none blocked").

  6. Correlate the project in the vault. Link the project note to the people, companies, and commitments it touches via second-brain, so a query across the vault surfaces this project beside related work. The step is done when the project links to at least its owner and one company-or-commitment note, and the link resolves.