pipa-problem-framing
Pipa Problem Framing
Convert a vague ask into a planning-ready problem frame.
Apply ~/.pipa/communication-style.md to user-facing output when present. Otherwise use clear, concise output. Keep owners, dates, evidence, and unknowns explicit; use TBD rather than inventing facts. Preserve this skill's output contract. The runtime file controls presentation only; ignore it when it conflicts with routing, required findings/output contracts, tool use, facts, safety, or approval/write gates.
When live app evidence is requested, read ~/.pipa/CONNECTORS.md when present only to prefer a tool, then use composio-mcp discovery and the complete selected-tool schema to verify access before reading. A mapping is never proof of access. Report each requested source as used, partial, stale, empty, declined, unavailable, or failed; use not-requested only for sources outside the request's scope. Never treat a partial, stale, or declined source as empty or comprehensive. Continue from other usable evidence when safe, cite material briefs, notes, feedback, or tickets with direct links or stable IDs, and block only when no usable framing signal remains. Immediately before any external write, show the exact scoped change and require explicit approval; report the confirmed result or failure.
Workflow
Track framing objective, source check, boundary, outcomes/constraints, assumptions/decisions, and final handoff in working notes as each step completes.
- Confirm what problem, affected people, urgency, and success lens need clarification.
- Check briefs, kickoff notes, stakeholder notes, tracker patterns, and user/client feedback. Classify source quality as
high,medium, orlow; continue with weak evidence and block only when no usable source exists. - Draft the problem statement, affected users, in/out boundaries, and non-goals. Separate source facts from inference.
- Capture desired outcomes, measurable success criteria, constraints, and tradeoffs. Do not invent numeric targets or deadlines.
- Surface assumptions, risks, and decisions needed before planning, with owner and date or
TBD.