3d-construction-sequence
3D construction sequence
Make each piece arrive at its designed final transform. In Shinonome Harbour the foundations settle first, market bays and upper floors follow, then the utilities switch on. The wire locates a piece before the material catches the light. Scrub the working assembly to inspect the handoff.
Give every piece a stable identity
Choose units someone could build or lift, such as a footing, column, floor slab, roof truss or equipment cabinet. Give each a final transform, a travel vector and a start time. Use support relationships for the order, then introduce a small deterministic stagger among peers. Keep beams rigid even when they span floors. Driving arrival from each vertex's height stretches diagonals and opens cracks.
For separate groups, move the group containing the solid and its wire. For batched geometry, bake the same four values into every vertex of a part and its corresponding edge endpoints before merging. Split vertices shared by parts with different schedules. Transform displacement vectors into the geometry's coordinate frame. A direction uses no translation. Instanced repeated parts can carry the schedule in an instance attribute.
Let the wire lead and the solid settle
Use a single normalized phase. These example values are fractions of the whole sequence. The harbour used about five seconds. Pick the offset and durations to suit the visible part size and viewing distance.