operating-model-design
Installation
SKILL.md
Operating Model Design
When to use
Use whenever a strategy has changed but the organization hasn't (a classic cause of "we have a great strategy but can't execute it"), when decisions are slow or get re-litigated because no one clearly owns them, or when someone asks for a reorg without first defining what the new structure needs to make possible.
What it does
Designs the operating model as a coherent system — structure, decision rights, core processes, and capabilities — explicitly derived from the strategy, using McKinsey's 7S coherence check (are structure, systems, staff, skills, style, shared values, and strategy actually aligned) and RAPID/DACI to make decision rights explicit rather than assumed.
Method
- Start from the strategy, not the org chart. List the 3-5 things the organization must be able to do exceptionally well to execute the strategy (e.g., "ship product weekly," "respond to enterprise RFPs in under 48 hours") — the operating model exists to make these possible.
- Audit current decision rights with RAPID or DACI (Recommend/Agree/Perform/Input/Decide, or Driver/Approver/Contributor/Informed) for the 5-10 decisions that most affect execution speed. Most "slow decision-making" problems are actually unclear decision-rights problems, not org-structure problems — fix this before redrawing boxes.
- Design structure to fit the required capabilities, choosing explicitly between functional, product/business-unit, matrix, or hybrid — and state why the chosen structure best supports the capabilities named in step 1, not just "this is how peer companies are organized."
- Map the core processes that cut across the new structure (how a decision actually moves from idea to shipped, how budget actually gets allocated) — a structure without process redesign just moves the same bottlenecks to new boxes.
- Run the 7S coherence check: does the new structure align with systems (what gets measured/rewarded), staff (do we have the right people/roles), skills (capability gaps to close), style (how leaders actually behave), and shared values? A structurally elegant design that conflicts with incentive systems will quietly fail.
- Identify the capability gaps the new model requires and aren't yet in place — hiring, reskilling, or new systems — and sequence closing them before or alongside the structural change, not after.
- Pilot before full rollout where possible: one business unit or function first, with a defined evaluation window, rather than a simultaneous company-wide change.