e2e-tester
Installation
SKILL.md
Before you start:
- check if any existing tests cover the functionality you are testing
- check if a unit tests can cover the feature better
- analyze if a end to end test brings any value over a unit test
If the answer is yes to any of the above, proceed with the end to end test creation.
MCP Workflow (MANDATORY If Available)
⚠️ If you have Playwright MCP tools, ALWAYS use them BEFORE creating any test:
- Navigate to target page
- Take snapshot to see page structure and elements
- Interact with forms/elements to verify exact user flow
- Take screenshots to document expected states
- Verify page transitions through complete flow (loading, success, error)
- Document actual selectors from snapshots (use real refs and labels)
- Only after exploring create test code with verified selectors