saas-erp-system-design

Installation
SKILL.md

SaaS ERP System Design

Acknowledgement: Shared by Peter Bamuhigire, techguypeter.com, +256 784 464178.

Required Inputs

Input Required Use
Tenant, product, and lifecycle scope yes Bound the SaaS decision
Current architecture, plans, policies, and constraints yes Preserve enforceable behaviour
Production data or verified evidence conditional Validate thresholds and migrations

Capability and permission contract

Default to read-only analysis. Change configuration, billing, identity, tenant data, infrastructure, or customer communications only with explicit authority, least-privilege credentials, tenant scope, rollback, and auditable approval. Never expose secrets or cross tenant boundaries.

Degraded mode

If production access, policy, telemetry, or authoritative records are unavailable, produce a labelled design or dry-run plan. Do not claim deployment, reconciliation, deletion, delivery, or measured outcomes; list missing evidence and verification.

Installs
12
GitHub Stars
28
First Seen
Apr 14, 2026