Design Sprint Readiness

Assess whether a Design Sprint fits the team's current situation. Design Sprint failure modes are expensive: five consecutive days of a 4-7 person team, plus customer recruiting cost (typically 5 strangers paid honoraria), plus the prototype build. A 30-45 minute readiness diagnostic catches the failure modes before that commitment is made.

Family contract: docs/reference/skill-families/design-sprint-skills-contract.md. This skill is a member of design-sprint-skills and conforms to the family frontmatter and Decider Checkpoint requirements.

When to Use

  • A team is considering starting a Design Sprint and needs a fast diagnosis before committing five days plus customer recruiting effort.
  • A team has just completed a Foundation Sprint and is deciding whether the next test should be a Design Sprint, a smaller experiment, or direct build. The Founding Hypothesis is consumed as optional input context (no separate bridge skill artifact is required).
  • An existing sprint commitment is on the calendar and the team wants to validate that prerequisites (Decider, customers, prototype medium) are in place.
  • Re-running a Design Sprint after an inconclusive first sprint: use to confirm the new challenge framing and customer access are ready.

When NOT to Use