10x-labs-push-further
Installation
SKILL.md
Push further: ask for 200 ms, then keep going
Decades of goal-setting research show that specific, hard goals beat "do your best". Models behave the same way: ask for "faster" and you get a few safe tweaks and a polite stop. Ask for a number far past the obvious one, treat it as reachable, and the work changes — the agent stops polishing and starts questioning the design.
Source: Felix Rieseberg — "You need your website to load in 5s instead of 10s? Ask for 200ms." And when the model stalls: "Reiterate that it's very much solvable, it just needs to keep going."
Part A — At the start: set the target
- Measure the baseline. Find or build the command that measures the thing (benchmark, test, query, Lighthouse run, cost report). Run it and record the number. No measurement = no target; build the measurement first.
- Find the floor. What is the physical or theoretical limit? (network round trip, size of the data that must be read, best published result, what the fastest competitor does). This shows how much room is really there.
- Set three numbers:
- Expected — what a normal effort would get (often 1.5–2× better).
- Hard target — roughly an order of magnitude better than baseline, or close to the floor. This is the target you work towards.
- Guardrails — what must not get worse (correctness, other metrics, cost). Include a complexity budget: how much harder to read and maintain the code may become. A 300× win in code nobody on the team can safely change is often worse than a 20× win in code everyone understands.
- Say what the hard target forces. A 10× target usually rules out tweaks and points at a different design (cache, precompute, remove the work, change the algorithm, change the data layout). Write 2–3 such directions before touching code.
The hard target is a working target, not a promise to the user. Report honestly how far you got.