development-plan-planning

Pass

Audited by Gen Agent Trust Hub on Oct 26, 2026

Risk Level: SAFEINDIRECT_PROMPT_INJECTION
Full Analysis
  • [INDIRECT_PROMPT_INJECTION]: The skill is designed to process project specifications and external reference materials. While this creates a data ingestion surface, the skill provides specific instructions to distinguish between source facts and user instructions, and to avoid carrying over project-specific data from reference documents.
  • Ingestion points: Processes original text and user instructions provided by a lead agent as described in SKILL.md.
  • Boundary markers: Instructions explicitly require distinguishing between source text and user instructions, and using stable requirement IDs to maintain structure.
  • Capability inventory: The skill is restricted to text drafting; it contains no shell execution, file system modifications, or network operations.
  • Sanitization: Implements source-tracking and internal classification (fact, goal, proposal, undecided) to ensure output integrity.
  • [SAFE]: The skill references a local design guideline (../references/document-design.md) for formatting consistency. This is a standard practice for maintaining document standards and does not involve external network requests or untrusted downloads.
  • [SAFE]: No credentials, obfuscation, or persistence mechanisms were detected. The skill's behavior is consistent with its stated purpose of document drafting.
Audit Metadata
Risk Level
SAFE
Analyzed
Oct 26, 2026, 12:01 PM