ppap
Installation
SKILL.md
Production Part Approval Process (PPAP)
When to use
Use this skill when:
- A supplier must submit parts for customer approval before Start of Production (SOP)
- A design change, process change, or engineering change requires re-submission
- An OEM or Tier 1 customer requests a PPAP at a specific level
- Reviewing or auditing an incoming PPAP package from a supplier
- Determining what PPAP level is required for a given change
Prerequisites
- Part number, revision level, and customer drawing
- Bill of Materials (BOM) if applicable
- Production process flow and manufacturing location confirmed
- Customer's PPAP level requirement (Level 1–5) or change category known