agricultural-easement-negotiation-frameworks
Installation
SKILL.md
Farm Operation Impact Assessment
Detailed analysis of how easement affects farm productivity, operations, and economics.
Crop Production Impacts
Permanent land loss (tower footprints, access roads):
- Tower footprints: 20m × 20m = 400 m² = 0.04 hectares per tower
- Access roads: 6m width, length varies (typically 100-500m) = 0.06-0.3 hectares
- Permanent loss (total): 0.1-0.35 hectares per tower + access
Soil class and crop type valuation:
- Class 1 soil (prime agricultural): $8,000-$12,000/hectare (corn, soybeans)
- Class 2 soil (good): $6,000-$9,000/hectare
- Class 3 soil (fair): $4,000-$7,000/hectare
- Pasture: $2,000-$4,000/hectare