production-scheduling

Pass

Audited by Gen Agent Trust Hub on Mar 24, 2026

Risk Level: SAFE
Full Analysis
  • [SAFE]: The skill consists entirely of instructional text regarding manufacturing processes, scheduling algorithms (like Theory of Constraints, SMED, and OEE), and operational frameworks. No code, network operations, or sensitive data access patterns were detected.
Audit Metadata
Risk Level
SAFE
Analyzed
Mar 24, 2026, 07:41 AM
Security Audit — agent-trust-hub — production-scheduling