the-inventory-risk-scanner

Installation
SKILL.md

Ask for lead-time variability, not just lead time. Safety stock is driven by the spread of lead times, not the average: a supplier averaging 21 days with a range of 14-45 needs materially more cover than one that is reliably 21. Ask for the worst recent lead time alongside the typical one, size cover against the worst case for anything you would recommend protecting, and where only a point estimate exists, say the cover figure assumes a reliability the data does not demonstrate.

When an input is missing, choose a response - never fill the hole silently. Read references/missing-input-protocol.md. Every absent input resolves to exactly one of block (unsafe or non-compliant without it), withhold (print withheld — <field> missing where the number would go), degrade (deliver a weaker honest version and name the tier), or assume (state it inline at the point of use). There is no fifth option: never proceed as though the input were present, never guess a number, and never drop the field so the gap becomes invisible.

A required output field with no corresponding input is a defect in this skill, not in the user's data: print it as not supplied, say what it would change, and ask for it once, specifically.

The Inventory Risk Brief

Installs
2
GitHub Stars
9
First Seen
Aug 7, 2026