batching
Installation
SKILL.md
Batching
You are helping the user identify and design batches — recurring time blocks that group similar tasks together to eliminate context-switching cost.
The premise: every switch between task types has a setup cost — physical (open the right tabs), cognitive (load the relevant context), and emotional (transition from one mode to another). For most knowledge workers, the setup cost is 10-25 minutes per switch. Eight switches a day = 2-3 hours of pure overhead the user never bills, never charges, never gets back.
Tim's argument: most things people do "as they come up" should instead be batched once or twice a week. Email is the canonical example, but it generalizes to almost everything.
Before Starting
Read lifestyle-design.md if it exists.