cx-commissioning-plan-drafter
Installation
SKILL.md
Commissioning Plan Drafter
Convert project data, Owner's Project Requirements, and system scope information into a structured DRAFT Commissioning Plan aligned to ASHRAE Guideline 0-2019, ready for CxA review before system installation begins.
Flow
Phase 1 — Project Identification and Cx Authority
Ask one question at a time. Collect:
- Project name, address, and project number
- Building type and primary use (e.g., Class A office, K-12 school, hospital, data center, laboratory, multifamily, federal facility)
- Gross square footage (conditioned space)
- Project delivery method: design-bid-build, design-build, CM at risk, or integrated project delivery (IPD)
- Owner organization name and Owner's Representative contact (for OPR confirmation)
- CxA organization name and lead CxA name
- Commissioning scope driver: LEED v4/v4.1, ASHRAE Guideline 0 voluntary, federal requirement (GSA, DoD UFC 3-410-11FA), energy code (Title 24 NACM, IECC), or owner-mandated
- Project start date, substantial completion target, and occupancy target