preliminary-cost-estimate-report
Installation
SKILL.md
Preliminary Cost Estimate Report
Converts project brief information into a DRAFT Class D (Schematic Design / Order-of-Magnitude) construction cost estimate report with an elemental cost breakdown, location and market-condition adjustments, tiered contingencies, and a clearly documented assumptions and exclusions list. Produces a report for the cost manager or QS to verify before presenting to the owner or design team.
Flow
Phase 1 — Project Intake
Ask one question at a time. Wait for each answer before proceeding.