skills/skills.volces.com/well-completion-design-memo

well-completion-design-memo

Installation
SKILL.md

Well Completion Design Memo

Convert wellbore data, formation analysis, and offset performance into a structured DRAFT hydraulic fracture completion design memo ready for licensed PE review before operations begin.

Flow

Phase 1 — Well and Project Identification

Ask one question at a time. Collect:

  • Well name, API number, and operator
  • Field/basin name and state (for applicable state oil and gas commission rules)
  • Wellbore geometry: vertical, deviated, or horizontal; measured depth (MD) and true vertical depth (TVD)
  • Lateral length (if horizontal)
  • Current wellbore status: new drill, re-completion, or workover

If API number or wellbore geometry is missing, flag as a DOCUMENTATION GAP — the memo can still proceed but must note incomplete identification.

Phase 2 — Target Formation and Interval Identification

Installs
3
First Seen
Aug 8, 2026