Purpose
Produce a concise, auditable engineering estimate (effort + risk) for a prepared work item. The skill's canonical outputs are:
- A machine-readable JSON object containing effort (hours, tshirt size, O/M/P, expected, recommended, range), risk (probability, impact, score, level, top drivers, mitigations), confidence, assumptions, and unknowns.
- A human-readable summary generated and posted by the orchestrator; the posted content is included in the orchestrator output.
Gating (mandatory)
Before doing any work the issue MUST be in the plan_complete stage. If it is not, refuse and output ONLY this single sentence (replace with the actual id):
The issue does not have a sufficiently detailed plan, as shown by it not being in the stage of plan_complete. Run the planning command with /plan <issue-id>
Do not output any other text when refusing.
When to use
Use this skill only after the Producer has prepared a plan and set the work item's stage to plan_complete. The plan should contain in-scope/out-of-scope notes, a lightweight WBS (5–12 items) and any known estimates or constraints.