e2e

Installation
SKILL.md

Efficient end-to-end tests

A browser suite is slow for a few reasons, and each one has a fix you can measure. Measure first, change one thing, measure again. Every number below comes from one real suite (Testate: 13 Playwright projects, five CI shards) unless it says otherwise.

Change Before After
Serve the built SPA, not the Vite dev server routes 52.8 s; a blank "Loading..." in 1 load of 25 on the dev server 20.3 s; 0 blank loads in 36 runs on each of the two builds
One CI job split into shards a flaky test re-ran the whole 6-minute stage it re-runs one shard; an unchanged shard skips
Move two projects out from behind the crawl slowest shard 4 min 0 s: 110 s of crawl, then 45 s that waited for it the 45 s run in the 1 min 41 s shard, beside the crawl's

1. Read the project first

Installs
10
GitHub Stars
2
First Seen
Oct 11, 2026