designing-two-way-syncs
Installation
SKILL.md
When to use
Use this guide to plan or change a sync: which tables, which direction, how existing records are linked, and what happens on deletes and schema changes. Also use it when a sync shows issues.
Use another guide when the person wants steps to run after a change (a workflow, see
getting-started) or when one of the apps has no Stacksync connector (building-connectors).