build-story-map
Installation
SKILL.md
Build Story Map
Use this skill to structure product requirements into multidimensional User Story Maps, define MVP walking skeletons, slice releases into prioritized swimlanes, and schedule dependencies using the Critical Path Method (CPM).
When to Use
- converting linear, overwhelming backlogs into structured 2D User Story Maps
- defining the minimum end-to-end viable product (Walking Skeleton) for early testing
- slicing feature releases into thematic swimlanes (MVP, Release 1.1, Release 2.0)
- conducting MoSCoW prioritization across release slices
- analyzing project schedule dependencies and calculating critical path float time (CPM)
- preparing structured, unambiguous delivery handoffs for engineering and business analysis