td-build-planning
Installation
SKILL.md
Build Planning
Plan before building. Scout the target network, decide what to create, allocate positions, phase the work.
Process
1. Scout
Understand what exists before adding anything.
project_info— project name,rootPath+parentShortcutfrom /perform winop, open panes. Always call first — userootPathfor all subsequent tool calls instead of assuming/project1list_operators(path, depth=2)— structure, positions, types, overlaps, existing annotationsget_connections(path, graph=true)— full signal flow topology in execution order with cycle detectionget_errors(path)— existing problemsget_operator_info(path)— details on specific ops (position, params, flags). Addinclude_extensions=truefor COMPs with extensions to see methods, clone source, config
Capture: rightmost X (for insertion point), Y range in use, existing null endpoints, available families, any overlaps to fix.