td-build-planning

Pass

Audited by Gen Agent Trust Hub on Oct 8, 2026

Risk Level: SAFEINDIRECT_PROMPT_INJECTION
Full Analysis
  • [INDIRECT_PROMPT_INJECTION]: The planning process involves ingesting existing network topology and operator metadata, which serves as a potential vector for indirect instructions.
  • Ingestion points: Operator lists, connection graphs, and specific operator info retrieved from the TouchDesigner network (referenced in the 'Scout' section of SKILL.md).
  • Boundary markers: The skill does not define specific delimiters or instructions to ignore embedded strings within the operator names or parameters it processes.
  • Capability inventory: The skill leverages the build_network tool to execute the resulting plan, which includes creating nodes, wiring connections, and setting parameter expressions.
  • Sanitization: There is no mention of filtering or sanitizing strings retrieved from the environment before they are used in the planning logic.
Audit Metadata
Risk Level
SAFE
Analyzed
Oct 8, 2026, 03:51 PM